Alto Lido hotel is one of the units belonging to Cardoso Group, a company founded in Madeira in 1979.
This hotel, open since 1983, underwent a thorough renovation in 2018, a project that included the most diverse areas of the hotel.
Cardoso Group entrusted FN hotelaria with contributing to this renovation through its intervention in terms of hotel equipment, as well as HVAC. FN hotelaria was the company responsible for the supply and installation of equipment for cold storage in cooking, preparation, pastry and storage areas. It was also responsible for the supply of cleaning and laundry equipment, as well as for the supply and installation of the auditorium furniture for the Business Center.
Our HVAC unit played a very important role in the renovation of Alto Lido hotel, being responsible for the remodeling of the thermal power station and the mechanical installations for air conditioning and ventilation.
In recent years, FN hotelaria has also carried out the installation of ventilation in the laundry (2019), the installation of air conditioning in the staff refectory (2020) and the implementation of the ventilation system in the kitchen preparation area (2024).
The same type of support has been provided to this client by our department dedicated to hotel equipment:
- supply of cleaning and laundry equipment (2019);
- supply and installation of buffet equipment for the Flor de Sal restaurant (2023);
- supply and installation of hotel equipment for The Tale restaurant: bar, pantry and wine cellar (2024 and 2025).